Customizing Demand Circuits
114062 Rev. B 9-13
Scheduling When the Demand Circuit Is Available
After you finalize the demand circuit’s configuration, you schedule when the
circuit is available. To do this:
1. Begin at the Configuration Manager window.
2. Select Dialup > Demand Circuits.
Site Manager displays the Demand Pools window (refer to Figure
9-1).
3. Click on PPP Circuits or FR Circuits.
Site Manager displays the appropriate demand circuit window (refer to
Figure 9-3 as an example).
4. Click on Schedule.
Site Manager displays the Circuit Time of Day Schedule window (PPP) or the
Pool Availability window (Frame Relay). The windows are the same but the
titles are different (Figure
9-9).
Figure 9-9. Circuit Time of Day Schedule Window
5.
Click on Add.