
148 BCM 5.0 analog terminal adapter testing
Nortel Business Communications Manager 5.0
Configuration — System
NN40170-501 02.04 Standard
September 2009
Copyright © 2009, Nortel Networks
Prerequisites for BCM50 analog terminal adapter testing
Ensure your ATA2 is installed and configured.
BCM50 analog terminal adapter testing navigation
Correcting a non-functioning ATA2 for BCM50 (page 148)
Correcting no dial tone at the ATA2 on BCM50 (page 148)
Confirming correct ATA2 wiring for BCM50 (page 149)
Correcting a non-functioning ATA2 for BCM50
Correct your ATA2, if it is not functioning properly.
Procedure steps
Step Action
1 Check for a dial tone using an analog device.
2 Check that AC power is connected to the ATA2 unit.
3 Check that the correct keycode has been entered for digital sets.
4 Verify that the ATA2 is connected to a digital station port.
5 Provide sufficient startup time (30–60 sec).
6 Plug an analog device into the phone port of the ATA2 and check for a dial-
tone.
--End--
Correcting no dial tone at the ATA2 on BCM50
Correct your ATA2 if there is no dial tone.
Procedure steps
Step Action
1 If you hear no dial tone, replace a single-line telephone for the data
communication device.
2 If you hear no dial tone at the ATA2 unit:
• Disconnect the line side of the ATA2. Connect a digital telephone to the
ATA2 p o r t .
• Check that the connection from the ATA2 to the BCM50 hardware works
correctly.
Comentarios a estos manuales