Procedure steps
Step Action
1 Check that the expansion port is connected to the proper connector.
2 Check the wiring to the MBM.
Make sure that the cables are properly seated and are connected to
the correct ports with proper LED indications.
3 Check that the switches on the MBM are all set to on.
If the MBM is a GASM or GATM, all the switches on the right are not
on. To check the MBM switches, you must remove the MBM from the
expansion unit.
4 Perform a firmware download to ensure that the correct version is
loaded on the ASM/GASM or GATM unit.
5 Use Business Element Manager or Telset Administration to check
the programming for the lines or extensions connected to the MBM.
6 Reboot the system to ensure that the BCM450 main unit functions
correctly.
7 If the programming is incorrect, use the Backup and Restore Utility to
load a recent backup of system programming. If a recent backup is
not available, correct the programming using Business Element
Manager or the Telephone Administration feature.
--End--
Troubleshooting the expansion unit for BCM50
Troubleshoot the BCM50 expansion unit if the expansion unit is not
functioning properly.
Prerequisites
• Test the BCM50 expansion unit for proper functionality. For more
information, see Testing the expansion unit or expansion cabinet for BCM
5.0 (page 138).
Procedure steps
Step Action
1 Check that the correct keycode has been entered for the expansion
unit.
2 Check that the expansion port is connected to the proper connector.