
BCM 5.0 main unit testing 135
Nortel Business Communications Manager 5.0
Configuration — System
NN40170-501 02.04 Standard
September 2009
Copyright © 2009, Nortel Networks
Procedure steps
Step Action
1 Verify that any nonfunctional feature is included in your installed keycode.
2 Check the wiring to the main unit and to the MBMs.
Make sure that the cables are properly seated and are connected to the
correct ports.
3 Reboot the BCM 5.0 system.
4 Check LEDs.
5 Use Element Manager or the Telset Administration feature to check the
programming for the lines or extensions that failed the call test.
6 If the programming is incorrect, use the Backup and Restore Utility to load
a recent backup of system programming. If a recent backup is not available,
correct the programming using Element Manager or the Telephone
Administration feature.
--End--
Comentarios a estos manuales