
Avaya Media Processing Server Series System Reference Manual
Page 34 # P0602477 Ver: 3.1.11
Software Overview
The following illustration shows the functional arrangement of the ASE and VOS
processes for MPS release 1.x. Though many of the processes are similar to those of
release 5.x, there are several new and revised processes, all of which are described in
the paragraphs that follow.
TMS
ASE/VOS Integration Layer
VOS Process Group
(1 per TMS)
PPro
App.
VAMP
MMF
To TRIPs of
other VOS
process groups
(if present)
CCM
SRP
VSTAT
VMM
TCAD
TRIP NCD
COMMGR
VENGINE
VMST VSUPD
PPro
App.
VENGINE
PPro
App.
VENGINE
CFG
VMem
LRM,
ADSM,
SIM
ASE
Processes
Common Processes
(1 each per node)
ALARMD
CONFIGD
VSH
NIC Pairs
Master Slave
TMS Common
Processes
(1 per node)
To h o s t
PMGR
CONOUT
CONSOLED
VSH
VSH
To alarm
viewer
To system
console
CCMA
host
protocol
Comentarios a estos manuales