Avaya (109352-E, Manual de usuario Pagina 74

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 144
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 73
Installing and Maintaining BN Platforms
3-12 109352-E Rev. A
Installing the BCN
Prepare the BCN for installation as follows:
1. Remove each power module (Figure 3-4). Removing the power modules
significantly reduces the weight of the BCN. You can remove the power
modules while the BCN is still on its shipping platform.
a. Using a flat-head screwdriver, loosen the captive screw until the
power module disengages.
b. Grasp the handle and pull the power module out of the BCN.
Figure 3-4. Removing a Power Module from the BCN
Warning: The BCN weighs approximately 214 lb (97.07 kg). Do not attempt
to lift it by yourself. Use a team of people or specialized lifting equipment.
Before placing the BCN in the rack, ensure that all equipment already inside
the rack is secure.
Screw
Power OK
Vista de pagina 73
1 2 ... 69 70 71 72 73 74 75 76 77 78 79 ... 143 144

Comentarios a estos manuales

Sin comentarios