
Hot-Swapping Hardware Components
109352-E Rev. A 5-13
• Before removing or installing a module, you must first access the interior of
your hardware platform. (Refer to Chapter 4, “Accessing the Interior,” for
instructions.)
The procedures for replacing a routing engine processor module or an SRM-F are
the same for the BLN, BLN-2, and BCN with one exception: you must first
remove a board retainer bracket from the BLN or BLN-2 in order to gain access to
the front modules.
Remove the board retainer bracket from a BLN or BLN-2 (Figure 5-6 or
Figure 5-7) as follows:
1. Use a screwdriver to release the screw connecting the board retainer
bracket to the chassis.
2. Gently pull the bottom of the board retainer bracket to remove it.
Figure 5-6. Routing Engine Modules and the SRM-F in a BLN
Caution: Electrostatic discharge can damage hardware. Use the antistatic
wrist strap when handling any hardware platform components.
Board Retainer Bracket
(1 Screw)
POWER
RUN
BOOT
DIAG
BACKBONE NODE
VOR jeglicher Intervention Gerat
ABSTELLEN und Netzstecker herauszuziehen!
Anleitungen in Installations-/Instandhaltungshandbuch beachten!
VORSICHT!
HOCHSPANNUNG!
APAGUESE la unidad y desconectese del tomacrriente
ANTES de abrir la unidad.
Veanse las instrucciones del fabricante en el manual de instalacion/servicio
PELIGRO
ALTO TENSION
!
Power unit OFF and disconnect power cord
BEFORE accessing this product.
Refer to your installation/service manual for instructions
WARNING
HIGH ENERGY PRESENT
Debrancher le cordon d’alimentation avant
d’enlever le couvercle.
Voir les instructions du fabricant
ATTENTION
EQUIPEMENT SOUS HAUTE TENSION
Extractor
SRM-F
(Slot 1)
RESET
FRE/FRE-2/ARE
Processor Module
(Slots 2-5)
Comentarios a estos manuales