Avaya (109352-E, Manual de usuario Pagina 29

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 144
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 28
109352-E Rev. A
1-1
Chapter 1
Installing the Backbone Link Node
You install the Backbone Link Node (BLN) hardware platform by
Preparing for installation
Setting up the BLN
Powering up the BLN and observing the hardware platform initialization
sequence
Cabling a console or modem to the BLN to establish a Bay Networks
Technician Interface session
Danger: Due to high-energy hazards, only qualified service personnel with
written authorization from Bay Networks are permitted to repair a BLN.
Chapter 5, “Hot-Swapping Hardware Components,” describes user-serviceable
procedures.
The BLN is not designed for use with an I.T. power system (a power
distribution system that has no direct connection to earth); the exposed
conductive parts of the BLN are grounded.
Caution: Inspect all items for any shipping damage. In particular, ensure that
the ports on the rear panel are not damaged. If you detect any damaged or
missing items, do not attempt to install the BLN. Contact the Bay Networks
Technical Response Center.
Vista de pagina 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 143 144

Comentarios a estos manuales

Sin comentarios