Avaya DMC DECT Fundamentals - Communications Server 1000 Manual de usuario Pagina 152

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 340
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 151
Installing additional IPE shelves or CS 1000E cabinets
Installing additional IPE shelves or cabinets includes the following tasks:
Install additional IPE modules.
• Install additional cabinets:
- Install IPE module wiring to the MDF.
- Install cabinet wiring to the MDF.
Installing additional IPE modules
Consult the work order and marked-up floor plan to determine if additional IPE modules are
required, then perform the steps in Installing additional IPE modules on page 152.
Note:
If unfamiliar with this process, refer to Avaya Communication Server 1000M and Meridian
1: Large System Installation and Commissioning (NN43021-310).
Installing additional IPE modules
1. Remove the IPE module front and rear covers.
Remove the covers from the module on which the DECT module will sit.
2. Remove the air grills.
Release the air grill tabs or Southco
®
fasteners and lift the air grill off.
3. Remove the top cap.
Loosen and remove the three front and rear top cap bolts. Lift off top cap.
4. Unfasten the column LED.
Remove the LED bracket bolts.
5. Remove the I/O back panel cover.
Unlock the four Southco fasteners.
6. Disconnect the column LED.
Unlock LED wiring connector latches on the module backplane. Detach the LED
wiring connector.
7. Disconnect the thermal sensor connector.
Installation and configuration
152 DMC DECT Fundamentals August 2012
Vista de pagina 151
1 2 ... 147 148 149 150 151 152 153 154 155 156 157 ... 339 340

Comentarios a estos manuales

Sin comentarios