
114947-A Rev. A
1-1
Chapter 1
Preparing for Installation
Depending on your configuration, complete these preliminary tasks as needed to
install the link module:
• Choose a slot
• Remove a link module
Choosing a Slot
You can install the link module in
• Slots 2 through 5 in the BLN platform (Figure
1-1)
• Slots 2 through 5 in the BLN-2 platform (Figure
1-2)
• Slots 1 through 6 and Slots 8 through 14 in the BCN platform (Figure 1-3)
Note:
In this guide, the term Token Ring link module includes Single, Dual,
and Quad Token Ring link modules, unless referring to a specific model.
Note:
There are no
user-configurable
jumpers on Token Ring link modules. If
you change any jumper settings on these modules you could jeopardize
module functioning.
Comentarios a estos manuales